Encanto at Dos Lagos

Cost-effective solutions from Hardy Frames® Shear Wall Systems and Structural Connectors contributed greatly to the success of a 1,200-apartment and 47-unit luxury apartment development.

465 shear walls installed. $250,000 worth of hangers, connectors, and straps.

Mission accomplished: the complex, cost-effective, code-compliant Encanto development was complete after 8 months of careful budgeting and collaboration. “We depend on our relationship with MiTek to give our clients the edge to compete in their markets,” says Holmes of Madera Components.  

The Story

string(4) “bold”

Encanto At Dos Lagos

Play Icon

Hardy Frame

Bottom Line

Adopting Hardy Frames shear walls added $30,000 back to Encanto’s bottom line, not to mention the benefits of using MiTek Builder Products and collaborating on SAPPHIRE software. 

They do whatever it takes to keep my guys at top productivity.
Shaw Structures
Scott Blythe

BACKGROUND

“Encanto used many products from MiTek Structural Connectors, plus the 465 Hardy Frames Shear Walls,” said Landon Boucher, Regional Sales Manager for MiTek. “When you have an order that large, with structures in different phases over an 8 months period, the delivery of MiTek Builder Products has to be right on time, every time.” ….Mission accomplished. 

Challenge

Building cost-effective solutions for a luxury market can be a challenge. With Hardy Frames Shear Walls, other MiTek Builder Products, coordination between the material dealer, the CM, the engineer and the framer, a complex project came together. 

THE SOLUTION

Hardy Framemd Shear Walls

Hardy Frames Shear Walls and MiTek Builder Products helped a complicated project targeted to the luxury market trim costs and still meet strict code requirements.

Download The Full Case Study Here

Download PDF